Hanon Systems Kft.

Székesfehérvár
2020, 2016
  • Electrical installation works of MV and LV power distributon system reconstruction.
  • Electrical installation works of the new production building for Hanon.
  • Automatic phase correction panels replacement for the whole production area
  • Electrical installation and fire alarm system implementation
  • Building automation installation works
  • Replacement works for the medium and low voltage equipment
  • installation of a fire alarm system

Megrendelő:

Halla Visteon