
Hanon Systems Kft.
Székesfehérvár
2020, 2016
- Electrical installation works of MV and LV power distributon system reconstruction.
- Electrical installation works of the new production building for Hanon.
- Automatic phase correction panels replacement for the whole production area
- Electrical installation and fire alarm system implementation
- Building automation installation works
- Replacement works for the medium and low voltage equipment
- installation of a fire alarm system
Megrendelő:
Halla Visteon